Check your consent path
Tiny homes NZ · Rules last checked 15 September 2026

Tiny homes in NZ, with the rules checked first

What you can put on your section, what it really costs all-in, and real homes from NZ builders when you're ready. Every rule sourced and dated.

Where the answers come from

One document, read end to end

Almost everything on the rules pages comes from the MBIE Tiny Houses guidance, fifth edition, January 2026. It is 25 pages of official answers that almost nobody reads, so we read it, quoted it and linked every claim back to it.

Where a figure could not be checked at its source, it is not on this site. Our editorial policy says which ones those are and why.

Start here

A granny flat up to 70 m² can now skip the building consent

Schedule 1A of the Building Act lets an eligible dwelling of up to 70 m² be built without a building consent. It is not a free pass: the restricted building work has to be designed and built, or supervised, by a Licensed Building Practitioner, you notify the council before you start and again when you finish, and it must meet the Building Code in full as a detached dwelling. MBIE adds its own warning that not all small buildings will qualify.

Wheels are a completely different question, and the intuitive answer is wrong. A tiny house on wheels is a building whenever it is immovable and occupied by people on a permanent or long-term basis — both halves, and holiday homes count as occupied.

10, 30 or 70 m²: which rule are you under?

10
Schedule 1, exemption 3

Up to 10 m²

No sanitary facilities, no potable water storage. Sleeping only if it is used with a dwelling and has no cooking facilities.

Read the rule
30
Schedule 1, exemptions 3A, 3B and 43

Over 10, up to 30 m²

Lightweight construction, or LBP-built or supervised, or an engineer-reviewed kitset. Not within 1 m of a residential building or a legal boundary.

Read the rule
70
Schedule 1A, granny flat

Up to 70 m²

A detached dwelling. Restricted building work designed and built or supervised by an LBP, and you notify the council before and after.

Read the rule

Areas drawn to scale against 70 m². These compare floor area only — a real 30 m² home is usually a long rectangle, not a square. Conditions from the MBIE Tiny Houses guidance, fifth edition, January 2026.

In progress

The Consent & Site Guide

The rules on this site are free and always will be. The guide is what you get when you want them turned into your build: the consent path for your type of home, a step-by-step checklist for what to send the council and when, the questions to ask about your specific site, an all-in cost worksheet, and the source list behind every rule in it.

  • Every rule in it links to MBIE, the legislation or your council
  • A dated source list, so you can see when it was last checked
  • Not on sale until it is written and checked
Free, no email needed

Not sure where you stand? Answer six questions.

Wheels or not, how big, whether it has a bathroom. At the end you get the rule that applies and a link to read it in full.

Check your consent path
Prices

Published builder prices start at $47,500 for a 6 m studio

That is Smart Housing Solutions's own published from-price for a 6 m studio, read on 15 September 2026. It is the price of the home. Site preparation, a power connection, plumbing and council fees all sit outside it, and the same builder publishes ranges of $1,500–8,000, $1,500–4,000, $1,500–6,000 and $1,500–5,000 for them.

We publish no average and no estimate of our own, because we are not a builder and we have not priced your site. What we publish is what real builders publish, quoted, with the date and a link.

See the full price tables

Frequently asked questions

Do I need consent for a tiny house on wheels?

Only if it is a building, and it is a building when it is both immovable and occupied by people on a permanent or long-term basis. Connecting it to on-site utility services such as stormwater or foul water needs a building consent either way.

What is the 70 m² granny flat exemption?

Schedule 1A of the Building Act lets an eligible dwelling of up to 70 m² be built without a building consent, if it meets specific design and construction conditions and the restricted building work is designed and built, or supervised, by a Licensed Building Practitioner.

Do I still have to tell the council?

For a granny flat under Schedule 1A, yes: MBIE says homeowners must notify their local council both before construction begins and after the building work is completed. And your district plan applies whatever the building consent answer is.

Can I build a granny flat myself under the exemption?

Not the restricted building work. That must be designed and built, or supervised, by a Licensed Building Practitioner. An LBP can supervise work you do, but they have to be involved.

Do you sell tiny homes?

That is the plan: homes from NZ builders who have signed a commission agreement with us. None are listed yet, because nothing goes up before an agreement is signed. Join the buyer waitlist and we'll email you when one matches what you're after.

How do you make money?

Two ways, both disclosed. A one-off $49 Consent & Site Guide, and commission paid by a builder when a home listed here sells. Never by the buyer, never for a ranking, and we don't sell your details to anyone.

Buying

Tell us what you're after

No homes are listed yet — nothing goes up before a builder signs an agreement with us. Tell us what you're after and we'll email you when a matching home is listed. No sales calls.

Join the buyer waitlist
Building tiny homes

List your homes with us

You pay a commission only when one sells. We check the consent path stated on every listing, the buyer buys from you under your own agreement, and you hold any deposit — not us.

List your homes